1. Strictly implement the specifications of the foundation drawing of solar street lamps (the construction specifications shall be clarified by the construction staff) and excavate the bottom pit along the roadside to the foundation pit;
2. In the foundation, the surface of the cloth where the street light cage is buried must be leveled (use a level gauge for testing and inspection), and the anchor bolts in the street light cage must be vertical to the upper surface of the foundation (use a square for testing and inspection) ;
3. After the excavation of the foundation pit is completed, place it for 1 to 2 days to check whether there is surface water seepage. If surface water seeps out, stop construction immediately;
4. Prepare special tools and select construction workers with construction work experience to prepare the solar street lamp foundation before construction;
5. Strictly follow the solar street light foundation map to use suitable concrete. Areas with strong soil acidity need to use unique corrosion-resistant concrete; fine sand and sand should not contain residues of the strength of concrete such as soil;
6. The soil layer around the foundation must be compacted;
7. After the solar street light foundation is made, it needs to be maintained for 5-7 days (according to the weather conditions);
8. The solar street light can be installed after the foundation has passed the acceptance.